WEATHER DATA FOR THE
PREVAILING WEEK
Date of Foundation
Pruning: 12/10/2022
Thursday
(13/10//22)–Wednesday (19/10/2022)
Location |
Temperature
(°C) |
Possibility of Rain |
Cloud
Cover |
Wind Speed
(Km/hr)
Min-Max |
R H%
|
||
Min |
Max |
Min |
Max |
||||
Nashik |
19-22 |
30-32 |
Nashik,
Dindori, Ozar, Palkhed, Kalwan,
Pimpalgaon Baswant,–
Thu- Drizzling rain,
Vani, Loni-
Thu, Fri,
Tue- Drizzling Rain. |
Clear to
cloudy |
08-14 |
39-66 |
62-80 |
Pune |
20-22 |
28-30 |
Pune,
Phursungi, Loni Kalbhor, Uruli
Kanchan, Patas, Yavat,
Narayangaon-
Thu, Fri,
Sat, Mon, Tue- Drizzling Rain.
Indapur-
Thu, Fri,
Sat- Drizzling Rain Baramati-
Thu-Wed - Drizzling to
light rain. |
Clear to
cloudy |
09-12 |
49-57 |
70-86 |
Solapur |
20-21 |
30-32 |
Solapur,
Latur, Ausa-
Thu-Wed - Drizzling to light
rain.
Barshi, Vairag-
Thu, Fri, Mon, Tue, Wed-
Drizzling to Light Rain.
Nannaj,
Pandharpur-
Thu, Fri,
Sun, Mon, Tue, Wed- Drizzling
Rain.
Tuljapur
-
Thu, Fri, Tue- Drizzling Rain. |
Clear to
cloudy |
09-14 |
55-63 |
84-88 |
Sangli |
21-23 |
30-32 |
Sangli, Arag,
Tasgaon, Kagvad, Miraj, Kawthe,
Shirguppi-
Thu-Wed -
Drizzling to light
rain.
Palsi,
Khanapur Vita, Walva-
Thu, Fri,
Sat, Mon, Tue, Wed- Drizzling
Rain.
Shetphal,
Palus-
Thu, Fri,
Mon, Tue, Wed- Drizzling to
Light Rain. |
Clear to
cloudy |
06-13 |
59-67 |
85-92 |
Vijayapura |
21-22 |
29-32 |
Vijayapura,
Chadchan Tikota & Telsang
–Thu-Wed- Drizzling to Light
rain. |
Clear to
cloudy |
07-11 |
57-70 |
83-90 |
Hyderabad |
21-22 |
28-31 |
Hyderabad,Medchal, Zahirabad--Thu-
Wed- Drizzling to Light rain. |
Clear to
cloudy |
06-10 |
48-60 |
82-88 |
Satara |
20-21 |
28-29 |
Satara,
Khatav, Phaltan–Thu-Wed-
Drizzling to Light Rain . |
Clear to
cloudy |
06-10 |
60-69 |
90-93 |
Ahmednagar |
19-21 |
29-30 |
Ahmednagar,
Shrigonda -Thu,
Fri, Sat, Drizzling.
Karjat-
Thu-Wed- Drizzling Rain.
Jamkhed,
Akole-
Thu, Fri,
Tue- Drizzling. Rahata,
Kopargaon,
Sangamner–Thu-Wed-
No rain. |
Clear to
cloudy |
11-16 |
56-60 |
66-88 |
Jalna |
19-21 |
28-29 |
Ambad, Jalna,
Gansawangi-
Thu, Fri,
Tue- Drizzling.
Mantha
- Thu, Fri, Sat, Tue- Drizzling.
Jafrabad –
Thu-Wed- Drizzling to Light
Rain. |
Clear to
cloudy |
11-14 |
45-56 |
66-81 |
Buldhana |
19-21 |
29-31 |
Buldana,
Chikhli-
Thu, Fri-
Drizzling Sindkhedraja,
D.raja -Thu, Fri, Tue-
Drizzling. |
Clear
to cloudy |
08-11 |
47-66 |
67-81 |
Kolhapur |
23-24 |
29-34 |
Gagan-bavada,
Kagal, Karveer-
Thu-Wed- Drizzling to Light
rain. |
Clear to
cloudy |
04-05 |
67-84 |
94-98 |
Bengaluru
Rural |
20-21 |
28-29 |
Anekal,
Doddaballapur,
Bengaluru-east, Bengaluru-north,
Bengaluru-south-
Thu-Wed- Drizzling to Light
rain. |
Clear to
cloudy |
05-08 |
54-61 |
84-91 |
Belagavi |
22-23 |
27-31 |
Gokak,
Belagavi, Athni, Chikodi,
Khanapur-
Thu-Wed- Drizzling to light Rain. |
Clear to
cloudy |
05-07 |
64-79 |
93-98 |
Bidar |
20-22 |
28-31 |
Bidar,
Basavakalyan,
Humanabad-
Thu- Wed- Drizzling to light
Rain. |
Clear to
cloudy |
03-09 |
56-73 |
88-94 |
Bagalkot |
21-22 |
28-31 |
Bagalkot,
Hungund,
Jamkhandi, Mudhol-
Thu- Wed- Drizzling to light
Rain. |
Clear to
cloudy |
05-10 |
53-67 |
83-93 |
Note: Above weather information is
summary of weather forecasting given in following websites
https://www.wunderground.com/?cm_ven=cgi
https://imdagrimet.gov.in/weatherdata/BlockWindow.php
https://www.timeanddate.com/weather/india
ICAR-National Research Centre for
Grapes does not claim accuracy of it.
II. Water management (Dr. A.K.
Upadhyay& Yukti Verma)
A)
Days after pruning : 181 days
B) Pan
evaporation: 2 to 4 mm
Amount of irrigation advised:
1.
Grape growing regions are forecasted
to receive drizzling to light rains. The irrigation water
application should be based upon the growth of the vines.
Objective is to concentrate on cane maturity, hence, vigour should be
controlled.
2.
If the soils especially medium and
heavy, are saturated with water, then, do not irrigate for atleast 5-7 days till
the soil comes to wapsa condition. The top soil is likely to
show dryness but, at lower depth water will be available for the vines. Allow
the new growth to stop first before starting irrigation.
3.
During shoot growth stage (Fruit
pruning season), apply irrigation through drip @ 3400-6800 L/
acre/ day for all grape growing regions. In case vigour is
more than desired, then reduce irrigation water application by half to 1700 -
3400 L/ acre and still if growth is more, stop the irrigation till such time the
growth is brought under control and then start irrigation.
Nutrient management
1.
After current rains, give foliar
spray of SOP @ 2-5 g/L depending upon canopy.
2.
In case of calcareous soils where
acute iron deficiency is observed, repeatedly spray 2-3g/L Ferrous sulphate two
to three times at 3 days interval followed by 15-20 kg/ acre Ferrous sulphate
application through drip. The fertigation dose should be
split into atleast 3 doses of 5kg each. Apply 5kg/ acre
soluble sulphur through drip every week. Also spray magnesium
sulphate and potassium sulphate @ 3 gm each/ L once only. Keep a close watch on
the development of leaf blackening symptoms if irrigation water contains sodium
more than 100ppm.
Pre-pruning operations – Fruit
pruning season
1.
Test the soil and irrigation water,
to plan for nutrient and water management during fruit pruning season.
2.
The vineyards where sodicity problems
are there, apply gypsum to the soil for removal of sodium from the soil exchange
complex. In case of calcareous soils, use sulphur for similar
purpose. The application should be alongwith FYM/compost etc.
They should be mixed in the soil and not left on the top.
3.
In case of calcareous soils, if SSP
is applied as basal dose, mix with FYM/compost etc. to avoid phosphorus
fixation.
4.
In areas where rains have not been
received and the irrigation water availability is less, it is suggested to flood
the rootzone(only) with water to leach out the salts and wet the entire soil
depth before pruning and then cover with mulch. Thereafter
irrigate as per availability of water.
Shoot Growth stage
1.
After current rains, give foliar
spray of SOP @ 2 g/L depending upon canopy.
2.
In case organic fertilizers are
applied, check the C:N ratio. Lower the ratio more the nitrogen release, hence
possibility of enhanced growth. Control nitrogen application based upon growth
of vine.
3.
Based upon the soil test value,
during shoot growth stage apply urea @ 15kg / acre this week in two splits.
If the soil is calcareous, instead of urea apply ammonium sulphate @ 25
kg/ acre in three splits this week. Depending upon the crop
vigour, regulate nitrogen application.
4.
If sodicity problem is there, apply
10 kg Sulphate of potash per acre in 2 splits this week.
5.
Until and unless leaves are fully
developed donot go for any foliar application of nutrients. It will lead to
wastage of spray.
6.
The quantity of nutrients to be
applied through foliar, depends upon canopy size.
7.
If the crop is between 5 leaf to
prebloom stage, apply Zinc sulphate and Ferrous sulphate @ 15 kg/ acre based
upon soil test value. Boron application should be carried out
only if soil test value indicates low levels and the irrigation water does not
contain boron. If during foundation puning, the petiole test
stated that boron was deficient then apply boron @ 1.5 kg to 5 kg depending upon
the soil test value. Apply one kg boron at a time.
8.
Apply 10 kg Magnesium sulphate per
acre if the crop is between 5 leaf to prebloom stage.
9.
If soils are calcareous, spray
Sulphate of potash and Magnesium sulphate @ 2-3g/L depending upon leaf age
during prebloom stage.
III. Requirement of growth regulators
(Dr. S.D. Ramteke)
-
NIL
IV. Canopy Management (Dr.
R.G.Somkuwar)
Based on the growth stages in grape
vineyard and change in weather condition during this period, following
suggestions are offered.
1.
With the rains in the last three
days, moisture in the root zone is increased. Hence, the root activity is not as
per the requirement of the vine.
2.
The shoot growth will be more even
the rains stopped.
3.
The growers may experience growth of
side shoots. This will certainly form the dense canopy.
4.
In the late pruned vineyard, sunlight
requirement by the individual bud on a growing shoot for fruit bud
differentiation will not be fulfilled.
5.
Even the vigorous growth (increased
in intermodal distance) will lead to formation of horizontal canopy.
6.
This will delay the cane maturity.
7.
The roots between two roots will be
more activated. This will results into uptake of unutilized nutrients leading to
excess growth.
8.
The leaf requirement on a growing
shoot is 16 to 17 no. (leaf area of each leaf is around 160-1702ft).
The leaf above this requirement is excess.
9.
The excess growth in terms of
increased leaf number may results into delay in cane maturity.
10. During the rainfall,
the new shoots will be more prone to anthracnose infection. Once the shoot is
infected, the organism will enter into the shoot and after forward pruning, the
bunch may get affected.
11. During this time, the
cloudy weather may become favorable for improvement in microclimate thereby
increasing the chances of powdery mildew infection.
12. Open canopy can be
the best option to avoid the disease incidence and advance the cane maturity.
13. To overcome these
problems, remove the excess growth, side shoots at the earliest possible.
14. The late coming
shoots on the cordon can also be removed by retaining one bud. Shoot pinching
can be done by removing just a growing tip.
15. Train the shoots on
the foliage wires. This will help for aeration in the canopy thereby reducing
the humidity.
16. Spray
Boudreaux mixture @ 1.0 % in the vineyard where cane maturity has been started
(120 days after foundation pruning). The spray can be repeated after 8-10 days.
However, Boudreaux sprays are to be avoided in case of colored varieties.
17. Irrigate
the vineyard when fertilizer is being applied through drips. Since the moisture
in the root zone is sufficient, irrigation is not advised.
18. For disease control,
biological control can be given the priority.
19.
In the vineyard where early pruning
is done, bud testing should be given importance. This will indicate the correct
position of fruitful buds thereby making easy for pruning.
V. Disease management (Dr. Sujoy
Saha)
Days after fruit pruning |
Risk of diseases |
|||
Downy mildew |
Powdery mildew |
Anthracnose |
Others (specify) |
|
181 |
Moderate |
Low |
High |
Bacterial spot- Moderate to
High
Rust- Moderate |
Rains are predicted in most of the grape
growing areas. At ponga stage application of copper fungicides may be done to
give a protection against downy mildew. At 5-7 leaf stage application of
Dimethomorph@1g/L+mancozeb 75WP@2g/L or Iprovalicarb+propineb @ 2.25g/L or
Mandipropamid@ 0.8g/L or Dimethomorph +ametoctradin@0.8g/L or Amisulbrom @ 0.375
ml/L should be done in absence of rain to protect against
downy mildew. If leaves are wet, dusting of Mancozeb @3-5 kg/ acre may be
done.Due to continuous rains in most of the areas anthracnoseandbacterial spot
may be incident in a moderate scale. Thiophenate methyl/carbendazim@1g/L should
be given for anthracnose control. An application of
Kasugamycin+Copperoxychloride may be given @ 0.75g/l for the management of both
bacterial spot and anthracnose, but specifically it should be more effective
against bacterial spot. Two sprays of Kasugamycin+Copperoxychlorideat 5-7 days
interval will give a good result against bacterial spot. Streptocycline should
NOT be applied for the control of bacterial diseases.
Powdery mildew may be disseminated by the rain splashes and initial symptoms may
be observed as soon as the rain stops. Application of triazoles like
hexaconazole or difenoconazole will control powdery mildew and additional
protection against anthracnose will be obtained as well. Foliar application of
Trichoderma @ 2-3g/ml should be given during this time to get a control against
anthracnose and downy mildew.No mixing of fungicides and biocontrol agents
should be done. For any foliar spray, silicon-based adjuvant should be used.
VI.
Insect and Mite management. (Dr. D.S. Yadav)
Growth Stage: Cane
maturity and afterwards stage after foundation pruning/Pre pruning
1.
High flea beetle incidence may be
noticed in the vineyards now. If not controlled it will cause serious damage
after fruit pruning. Remove weeds from inside and around the vineyards.
Harrowing may be done in inter row space once the rainy spell is over. Give soil
drenching with clothianidin 50 WDG @ 200 gram per acre in the root zone to kill
flea beetle grubs in the soil. Thereafter, foliar application of lambda
cyhalothrin 4.9 CS @ 200 ml per acre or imidacloprid 17.8 SL @ 160 ml per acre
at night after 7 pm may be given.
2.
In case of caterpillar infestation,
installation of light traps outside vineyards is the best strategy to manage
caterpillar population.
3.
Red colour stem borer (Dervishiya
cadambae) has started egg laying and infestation under bark in grape areas.
Install light traps near the vineyards to manage moths of this stem borer.
Remove loose bark from stem and cordons and give preventive wash on stem and
cordons with biocontrol agent Metarhizium @ 3-5 ml per litre water
minimum once in the month during July to September months. If infestation is
observed, remove the loose bark and give stem and cordon wash with
Metarhizium @ 3-5 ml per litre water and 1.5-2 litres water per plant.
4.
In new vineyards after
grafting, flea beetle infestation may be observed. In case of heavy infestation,
give soil drenching with imidacloprid 17.8 SL @ 1.5 ml per plant and foliar
application with spinosad 45 SC @ 0.25 ml per litre or spinetoram 11.7 SC @ 0.3
ml per litre or fipronil 80 WG @ 0.0625 g per litre water.